Project milestone rubric
The term project has four milestones worth 20 marks: proposal (2), technical specification (4), alpha and task backlog (6), and final (8). A project has one or two members. The two members of a pair share the milestone marks. Each member takes a separate 15-mark defense, which this page does not cover.
Purpose
Marks go to engineering evidence only: the specification, the instruction file and hook gate, tests and their mutation result, the evaluation script, the disposition of the security scan (what you decided about each finding, with your evidence), and the README. Any topic is allowed, but a project with an interface and features and no specification, gate, tests or evaluation earns no milestone marks. This rule is applied before the items are counted: such a project earns no milestone marks whatever items its documents list, and every other project is marked milestone by milestone in proportion to its items, as set out below.
Records
| Milestone | Week | Marks | What must be there |
|---|---|---|---|
| Proposal | 2 | 2 | What it is; who it is for; the core scenario; the agent's role in development. |
| Technical specification | 4 | 4 | Requirements; key decisions, each with a rejected alternative; interfaces and data models; test strategy; what is out of scope. |
| Alpha and task backlog | 7 | 6 | One minimal path that runs end to end; an instruction file in the repository; one hook gate in the repository; a backlog of remaining tasks. |
| Final | 12 | 8 | Working software; tests with their mutation result; one evaluation script; the disposition of a security scan; a README. |
For the proposal and the technical specification, an item counts when the document states it at the submitted revision. For the alpha and the final, each item also needs the check that verifies it: the command, the revision and the result.
Each milestone is marked in proportion to the items in its row that count: the marks are the milestone's maximum multiplied by the number of items that count and divided by the number of items listed. The items are the ones separated by semicolons in the table above.
| Milestone | Items listed | Marks for each item that counts |
|---|---|---|
| Proposal | 4 | 0.5 |
| Technical specification | 5 | 0.8 |
| Alpha and task backlog | 4 | 1.5 |
| Final | 5 | 1.6 |
Your feedback names each item that did not count. A milestone that is not submitted earns no marks.
A result counts only with the revision and command that produced it. A predicted result or a command that was not run is not a check. Work that is not yet due is recorded as missing, not as zero. The project page describes what each kind of evidence should show, including what the evaluation script evaluates.
Review
To ask for a review, name the milestone, the item, the submitted revision and the evidence you want reconsidered. A person reviews it and you have the opportunity to respond. Writing style, commit count, how the interface looks and how much of the code an agent wrote do not affect the mark.